![]() ![]() It consists of resurfacing the existing roadway by milling and repaving approximately 2” of the existing asphalt surface. Project Description: This project involves resurfacing CTH P from the Wood County Line to the Village of Junction City. Project: CTH P (Wood County Line to Kramer Ave) Resurfacing Access will be provided to adjacent residences and businesses as well as emergency vehicles during construction, but all other traffic shall utilize alternate routes.Įstimated Construction Date: Anticipated start date is May 2023. Roadway and driveway culverts will be replaced as well as the culvert crossing Bear Creek.ĬTH K will be closed to through traffic throughout construction. Ditch slopes will be upgraded to meet current design standards and the deteriorated asphalt surface will be replaced. Project Description: The CTH K project will consist of reconditioning CTH K to improve the roadway profile, pavement structure, and drainage along the project. Project: CTH K (CTH D to CTH B) Reconditioning Utility relocation and tree clearing is scheduled to start March 7 th. ![]() The roadway will be closed to through traffic during construction and any non-residents should use alternate routes.Įstimated Construction Date: Anticipated state date is early June with completion in November for roadway reconstruction. Construction is planned for 2023 and will be completed by a private contractor. The posted speed will be reduced to 40 mph. ![]() Curb and gutter will used instead of shoulders and ditches in some locations to facilitate drainage. A 24’ ditch will separate the 10’ wide multi-use path from the edge of the aggregate shoulder. The reconstructed County R will consist of two 12’ lanes, a center 14’ two-way left turn lane, 4’ paved shoulders and 2’ aggregate shoulders. The project is scheduled to be let in March and will be constructed by a private contractor.Ĭounty R is currently a 2-lane undivided highway with a posted speed of 45 mph. The County has consulted with engineering firm AECOM to design these improvements. Project Description: CTH R planned improvements include design of a 2-lane facility with a two-way left turn lane, a new structure over the Little Plover River, and a 10-foot wide multi-use path along the west side of the roadway. Project: CTH R (Black Oak Drive to Porter Road) Reconstruction ![]()
0 Comments
Leave a Reply. |